Difference between revisions of "Resource / X"
Jump to navigation
Jump to search
(Created page with "One d6 is to be rolled at the end of each round (during the maintenance phase) for every nexus endowed with Resource / X. On a result of X or more the nexus recovers a load. T...") |
(No difference)
|
Latest revision as of 04:09, 19 April 2023
One d6 is to be rolled at the end of each round (during the maintenance phase) for every nexus endowed with Resource / X. On a result of X or more the nexus recovers a load. This does not allow it to recover more than the value printed on its reference card.